1 y - Translate

https://www.selleckchem.com/products/bms493.html
Three pre-implementation cases performed more than 3 hours prior to appointment time were excluded (presumed to be rescheduled cases). Mean time between appointment time and procedure start time decreased from 2.7 minutes after to 5.6 minutes before appointment start time, an 8.3-minute improvement (P=0.0001), with sustained improvement by statistical process control analysis. Mean time for procedure length increased by 4.7 minutes (P=0.001). There was no significant difference in mean time of patient arrival to appointment time pre- and