The cooling system and raw water pump should be flushed after each 600 hours and the warmth exchanger should be cleaned after each 2,400 hours of generator operation. The generator ought to be positioned in an open and ventilated area that has sufficient provide of recent air. The National Electric Code (NEC) mandates that a minimum area of three ft must be allowed on all sides of the generator to ensure free flow of cooling air. Raw/fresh water is typically used as a coolant for turbines, however these are largely restricte